Menu Close
  • All Lessons
  • Minecraft Your Summer

1 2 3 4 Next › Last »

Lesson List

Lesson # Title Dates of Lessons Notes Links
47 The Cutty Sark – Show and Tell
August 11, 2026 (NA)
Show us what you have built!
46 The Cutty Sark – Final Details & The Figurehead
August 4, 2026 (NA)
Add in any final missing details and the figurehead of the Cutty Sark
45 The Cutty Sark – Adding the Sails
July 21, 2026 (NA)
Add in the sails of the Cutty Sark and tweak any parts of the masts or rigging to make it look amazing
44 The Cutty Sark – Rigging (Ropes & Chains)
July 14, 2026 (NA)
Add in the massive amounts of rigging to help bring the Cutty Sark to life
43 The Cutty Sark – The Bowsprit & Yards
July 7, 2026 (NA)
Construct the bowsprit and the yards on the front of the Cutty Sark
42 The Cutty Sark – Building the Three Masts
June 30, 2026 (NA)
Construct each of the three massive masts of the Cutty Sark
41 The Cutty Sark – Raised Decks & Cabins
June 23, 2026 (NA)
Build the main deck to life and add in the raised cabins and decks of the Cutty Sark
40 The Cutty Sark – Upper Hull & Decking
June 16, 2026 (NA)
Build the upper hull and deck of the Cutty Sark
39 The Cutty Sark – Lower Hull
June 9, 2026 (NA)
Construct the lower hull and deck of the Cutty Sark
38 The Cutty Sark – The Keel & Frame
June 2, 2026 (NA)
Start building the frame and keel of the beautiful Cutty Sark
37 Space Station – Show and Tell (Week 7)
May 25, 2026 (NA)
Show us what you have built!
36 Space Station – Hydroponics and Support Module
May 18, 2026 (NA)
Construct a hydroponics (food and plant growing area) as well as an equipment store
35 Space Station – Command Module and Tug
May 11, 2026 (NA)
Construct a command module for the station, as well as a small vehicle that can act as a tug
34 Space Station – Escape Pods and Communications Array
May 4, 2026 (NA)
Construct the communications array for your station as well as a couple of escape pods for the astronauts to use in an emergency
33 Space Station – Rocket/Shuttle
April 20, 2026 (NA)
Construct the rocket or shuttle that takes you to the space station

1 2 3 4 Next › Last »

Add your content here…

Lesson List

Lesson # Title Dates of Lessons Notes Links
47 The Cutty Sark – Show and Tell
August 11, 2026 (NA)
Show us what you have built!
46 The Cutty Sark – Final Details & The Figurehead
August 4, 2026 (NA)
Add in any final missing details and the figurehead of the Cutty Sark
45 The Cutty Sark – Adding the Sails
July 21, 2026 (NA)
Add in the sails of the Cutty Sark and tweak any parts of the masts or rigging to make it look amazing
44 The Cutty Sark – Rigging (Ropes & Chains)
July 14, 2026 (NA)
Add in the massive amounts of rigging to help bring the Cutty Sark to life
43 The Cutty Sark – The Bowsprit & Yards
July 7, 2026 (NA)
Construct the bowsprit and the yards on the front of the Cutty Sark
39 The Cutty Sark – Lower Hull
June 9, 2026 (NA)
Construct the lower hull and deck of the Cutty Sark
38 The Cutty Sark – The Keel & Frame
June 2, 2026 (NA)
Start building the frame and keel of the beautiful Cutty Sark

Upcoming Lessons

Class # Date Time Zone / Clue
40 June 16, 2026 (North America)

Construct the upper section of the hull

Shape the hull to follow the correct curve for the Cutty Sark

Place the equipment in the upper half of the hull

Add the main deck

41 June 23, 2026 (North America)

Construct the raised decks above the main deck of the Cutty Sark

Add the cabins to the raised decks

Place furniture within the cabins

42 June 30, 2026 (North America)

Construct each of the three masts

Make sure the height and position are accurate

Add any crossbeams to the masts

43 July 7, 2026 (North America)
44 July 14, 2026 (North America)
45 July 21, 2026 (North America)
46 August 4, 2026 (North America)
47 August 11, 2026 (North America)
  • Show your Cutty Sark build
  • Send pictures or video clips to the Slack channel ahead of the class
  • Or share your screen during the class (as time permits)
No Upcoming Lessons

Past Lessons

Class # Date / Time Zone Title
39 June 9, 2026 (NA) The Cutty Sark – Lower Hull
38 June 2, 2026 (NA) The Cutty Sark – The Keel & Frame
37 May 25, 2026 (NA) Space Station – Show and Tell (Week 7)
36 May 18, 2026 (NA) Space Station – Hydroponics and Support Module
35 May 11, 2026 (NA) Space Station – Command Module and Tug
34 May 4, 2026 (NA) Space Station – Escape Pods and Communications Array
33 April 20, 2026 (NA) Space Station – Rocket/Shuttle
32 April 13, 2026 (NA) Space Station – Research Hub and Solar Panels
No Past Lessons